Planning, resources, decisions and profitability in one connected system. For more project performance with the same organization.
Where does the portfolio need attention, and where does leadership have to intervene?
What needs my attention today, across all projects?
Which knowledge from earlier projects helps with the next decision?
Fragmented project steering and lost project knowledge belong together. One project lives in MS Project, Excel, PowerPoint, email threads, local trackers and in the heads of experienced project managers. Different data states, extra coordination effort and decisions on an incomplete basis are the result. In many industrial companies this is the normal state today.
The status for tomorrow is being assembled right now from five files and three phone calls. Dates, risks and open decisions get collected and reconciled. And tomorrow, a piece of information can still surface in the room that is missing from the picture today.
Project managers build their own trackers, reports and routines. No project is comparable with the next.
Experience from decisions, risks and problem solving stays with individuals and is lost when they move on.
Late changes, resource bottlenecks and gate gaps raise cost, endanger dates and put pressure on margin.
What changes as a result:
Replaces MS Project · Jira · PowerPoint status · Excel trackers · side Excels. Connects ERP · PLM · identity · DMS / SharePoint.
EvoltirAI works with the data and experience from your own projects. It finds relevant context, automates recurring work and supports decisions with sources from your own project history.
A simplified worked example. The actual effect depends on project size, starting situation and adoption, and is measured against your baseline in the pilot.
From the management roadmap to tasks and actions, project management works on the same planning state.
Directly from project planning, without maintaining a separate roadmap.
When a task changes, dependencies and effects are recalculated directly.
Tasks and actions stay connected to the project context.
Transcript and AI summary capture decisions, risks, actions and next steps and make them findable again later.
Project managers plan the demand, department leads decide on capacity and specific people get assigned. Bottlenecks between projects become visible before dates are at risk.
Scenarios stay separate from the approved plan until a decision is taken.
Technical scope, schedule impact, cost, lifetime result and approval are assessed together. The commercial effect is therefore visible before the decision is taken.
SOP pressure, customer gates, supplier dependencies and margin pressure. Evoltir connects schedules, resources, changes and result impact in one steering model.
Automotive →Long lead times, customer-specific scope, engineering dependencies and scarce specialists. Evoltir connects planning, capacity, changes and delivery dates across the whole project.
Machinery & plant engineering →Long project durations, extensive governance, evidence obligations and the high cost of late changes. Evoltir connects gate readiness, decisions and traceability in one system.
Aerospace →Complex stakeholder structures, long project horizons, dependencies and investment steering. Evoltir connects portfolio, schedules, resources and result impact in one shared steering model.
Energy & infrastructure →Complex projects with limited PMO and specialist capacity. Evoltir delivers structured project and portfolio steering without a heavy enterprise implementation.
Industrial Mittelstand →When tasks, actions, gates, risks, changes and dates are maintained where they are worked on, the live status emerges from the work itself.
Earlier decisions, risks, changes and solutions become findable and backed by sources. “Which risks occurred in comparable project phases?”
Documents, bills of materials, voice input and meetings become project objects, risks, change requests, status reports, actions or planning drafts.
EvoltirAI can point out missing impacts, incomplete entries or contradictions and prepare next steps. Write actions always run through confirmation.
Processing exclusively in the EU. No sharing with third parties and no training of external AI models on your data.
The AI only accesses information the respective user is allowed to see. Write actions are prepared, confirmed and documented in the audit log.
Kill switch and cost limits per workspace give you control over which AI functions are used and to what extent.
More than 15 years in complex industrial projects, from project member through project and department leadership to responsibility for a portfolio of more than 45 projects. Exactly the four levels Evoltir maps today: person → project → department → portfolio.
15+ years of project leadership · 160+ industrial projects · teams up to 400 members · >80 M $ project budgets · 4 continents
One running project, success criteria defined in advance and a fixed pilot scope. The fixed fee is fully credited on conversion.
In the demo you experience Evoltir in a prepared workspace with realistic project data. In the 90-day pilot we put Evoltir to work on one of your running projects.
Workspace-isolated data, role-based access, a complete history and central control functions for AI and operation. See security and data sovereignty.